| Metric | Nov 6, 2024 FY24 Q3 | Feb 13, 2025 FY24 Q4 | May 1, 2025 FY25 Q1 | Aug 4, 2025 FY25 Q2 | Nov 5, 2025 FY25 Q3 | Jan 26, 2026 FY25 Q4 | May 5, 2026 FY26 Q1 | Aug 4, 2026 FY26 Q2 |
|---|---|---|---|---|---|---|---|---|
| For FY2026 | ||||||||
| Capital investment for corporate projects | — | — | — | — | — | New“$9-$13 million” | — | — |
| Capital investment trend | — | — | — | — | — | — | New“expected to ramp up in the second quarter with the warmer construction months and remain elevated in the third quarter” | — |
| Casa Berardi AISC, after by-product credits, per produced gold ounce | — | — | — | — | — | New“$2,150 - $2,350” | — | — |
| Casa Berardi Capital Investment - Growth (millions) | — | — | — | — | — | New“$12 - $14” | — | — |
| Casa Berardi Capital Investment - Sustaining (millions) | — | — | — | — | — | New“$39 - $42” | — | — |
| Casa Berardi Capital Investment - Total (millions) | — | — | — | — | — | New“$51 - $56” | — | — |
| Casa Berardi cash cost per gold ounce (after by-product credits) | — | — | — | — | — | New“$1,700-$1,850” | — | — |
| Casa Berardi Gold Production (Koz) | — | — | — | — | — | New“83.0 - 91.0” | — | — |
| Casa Berardi Silver Production (Moz) | — | — | — | — | — | New“N/A” | — | — |
| Casa Berardi total cost of sales (includes depreciation) | — | — | — | — | — | New“$192 million” | — | — |
| Casa Berardi Total Cost of Sales (million) | — | — | — | — | — | New“192.0” | — | — |
| Consolidated gold production | — | — | — | — | — | New“134-146 thousand ounces” | — | — |
| Consolidated silver production | — | — | — | — | — | New“15.1-16.5 million ounces” | — | Narrowed“15.1-16.1 million ounces” |
| Consolidated silver total cost of sales | — | — | — | — | — | New“$471 million” | — | — |
| Core drills deployed | — | — | — | — | — | — | New“expected to increase from the 13 currently deployed to 19” | — |
| Corporate Capital Investment - Sustaining | — | — | — | — | — | — | — | New“9 - 11” |
| Corporate Capital Investment - Sustaining | — | — | — | — | — | New“$9 - $13” | — | — |
| Exploration and pre-development expenditures | — | — | — | — | — | — | — | New“$55 million” |
| Exploration budget allocated to Nevada project portfolio | — | — | — | — | — | — | New“$16 million” | — |
| Greens Creek AISC per silver ounce (after by-product credits) | — | — | — | — | — | — | — | New“($4.25)-($3.75)” |
| Greens Creek AISC, after by-product credits, per produced silver ounce | — | — | — | — | — | New“$0.00 - $0.50” | — | — |
| Greens Creek Capital Investment - Sustaining | — | — | — | — | — | — | — | New“61 - 65” |
| Greens Creek Capital Investment - Sustaining (millions) | — | — | — | — | — | New“$66 - $71” | — | — |
| Greens Creek cash cost per silver ounce (after by-product credits) | — | — | — | — | — | New“($9.00)-($8.25)” | — | Raised“($12.50)-($12.00)” |
| Greens Creek costs applicable to sales (excludes depreciation) | — | — | — | — | — | — | — | New“$240 million” |
| Greens Creek Costs applicable to sales (millions) | — | — | — | — | — | — | — | New“240” |
| Greens Creek gold production | — | — | — | — | — | — | — | New“51.0-55.0 koz” |
| Greens Creek Gold Production (Koz) | — | — | — | — | — | New“51.0 - 55.0” | — | — |
| Greens Creek silver production | — | — | — | — | — | — | — | New“8.0-8.3 million ounces” |
| Greens Creek Silver Production (Moz) | — | — | — | — | — | New“4.5 - 8.1” | — | Raised“8.0 - 8.3” |
| Greens Creek total cost of sales (includes depreciation) | — | — | — | — | — | New“$287 million” | — | — |
| Greens Creek Total Cost of Sales (million) | — | — | — | — | — | New“287.0” | — | — |
| Investment in exploration and pre-development | — | — | — | — | — | New“$55 million” | — | — |
| Keno Hill 2026 drill program | — | — | — | — | — | — | New“approximately 80,000 feet of drilling” | — |
| Keno Hill Capital Investment - Growth | — | — | — | — | — | — | — | New“61 - 65” |
| Keno Hill Capital Investment - Growth | — | — | — | — | — | New“$61 - $66” | — | — |
| Keno Hill Gold Production (Koz) | — | — | — | — | — | New“N/A” | — | Reiterated“N/A” |
| Keno Hill silver production | — | — | — | — | — | — | — | New“2.2-2.6 million ounces” |
| Keno Hill Silver Production (Moz) | — | — | — | — | — | New“2.9 - 3.2” | — | Lowered“2.2 - 2.6” |
| Lucky Friday AISC (after by-product credits), per silver ounce | — | — | — | — | — | — | — | New“$24.50-$26.00” |
| Lucky Friday AISC, after by-product credits, per produced silver ounce | — | — | — | — | — | New“$23.50 - $26.00” | — | — |
| Lucky Friday Capital Investment - Sustaining | — | — | — | — | — | — | — | New“77 - 82” |
| Lucky Friday Capital Investment - Sustaining (millions) | — | — | — | — | — | New“$68 - $73” | — | — |
| Lucky Friday cash cost (after by-product credits), per silver ounce | — | — | — | — | — | — | — | New“$9.00-$9.75” |
| Lucky Friday cash cost per silver ounce (after by-product credits) | — | — | — | — | — | New“$10.25-$11.00” | — | — |
| Lucky Friday costs applicable to sales (excludes depreciation) | — | — | — | — | — | — | — | New“$139 million” |
| Lucky Friday Costs applicable to sales (millions) | — | — | — | — | — | — | — | New“140” |
| Lucky Friday Gold Production (Koz) | — | — | — | — | — | New“N/A” | — | Reiterated“N/A” |
| Lucky Friday silver production | — | — | — | — | — | — | — | New“4.9-5.2 million ounces” |
| Lucky Friday Silver Production (Moz) | — | — | — | — | — | New“4.7 - 5.2” | — | Narrowed“4.9 - 5.2” |
| Lucky Friday total cost of sales (includes depreciation) | — | — | — | — | — | New“$184 million” | — | — |
| Lucky Friday Total Cost of Sales (million) | — | — | — | — | — | New“184.0” | — | — |
| Nevada exploration investment | — | — | — | — | — | — | — | New“$16 million” |
| Production and cost | — | — | — | — | — | — | New“reiterated” | — |
| Quarterly cash dividend, common stock | — | — | — | — | — | — | New“$0.00375 per share” | — |
| Quarterly cash dividend, Series B preferred stock | — | — | — | — | — | — | New“$0.875 per share” | — |
| Series B preferred stock quarterly dividend declared | — | — | — | — | New“$0.875 per share” | — | — | — |
| Total capital (growth and sustaining) investment | — | — | — | — | — | — | — | New“$208-$223 million” |
| Total Capital Investment - Growth | — | — | — | — | — | — | — | New“$61 - $65” |
| Total Capital Investment - Growth (millions) | — | — | — | — | — | New“$73 - $80” | — | — |
| Total Capital Investment - Sustaining | — | — | — | — | — | — | — | New“$147 - 158” |
| Total Capital Investment - Sustaining (millions) | — | — | — | — | — | New“$182 - $199” | — | — |
| Total Capital Investment - Total | — | — | — | — | — | — | — | New“$208 - 223” |
| Total Capital Investment - Total (millions) | — | — | — | — | — | New“$255 - $279” | — | — |
| Total capital investment (sustaining and growth) | — | — | — | — | — | New“$255-$279 million” | — | — |
| Total Gold Production (Koz) | — | — | — | — | — | New“134.0 - 146.0” | — | Lowered“51.0 - 55.0” |
| Total Silver AISC, after by-product credits, per produced silver ounce | — | — | — | — | — | New“$15.00 - $16.25” | — | Lowered“$12.50 - $13.50” |
| Total Silver Cash cost, after by-product credits, per silver ounce | — | — | — | — | — | New“($1.50) - ($1.25)” | — | Raised“($4.00) - ($3.75)” |
| Total Silver Costs applicable to sales (millions) | — | — | — | — | — | — | — | New“380” |
| Total Silver Production (Moz) | — | — | — | — | — | New“15.1 - 16.5” | — | Narrowed“15.1 - 16.1” |
| Total Silver Total Cost of Sales (million) | — | — | — | — | — | New“471.0” | — | — |
| For FY2025 | ||||||||
| Annual interest expense savings from Notes redemption and IQ Notes repayment | — | — | — | New“$17.8 million annually” | — | — | — | — |
| Casa Berardi AISC, after by-product credits, per gold ounce | — | New“$1,750 - $1,950” | — | Reiterated“$1,750-$1,950/oz” | — | — | — | — |
| Casa Berardi AISC, after by-product credits, per produced gold ounce | — | — | — | — | New“$1,850 - $2,000” | — | — | — |
| Casa Berardi AISC, per gold ounce (after by-product credits) | — | — | New“$1,750-$1,950/oz” | — | — | — | — | — |
| Casa Berardi Capital expenditures - Growth (millions) | — | New“$39 - $42” | Reiterated“$39 - $42” | Reiterated“$39 - $42” | Raised“$45 - $47” | — | — | — |
| Casa Berardi Capital expenditures - Sustaining (millions) | — | New“$19 - $21” | Reiterated“$19 - $21” | Reiterated“$19 - $21” | Reiterated“$19 - $21” | — | — | — |
| Casa Berardi Capital expenditures - Total (millions) | — | — | — | — | New“$64 - $68” | — | — | — |
| Casa Berardi Cash cost, after by-product credits, per gold ounce | — | — | — | New“$1,500-$1,650/oz” | Raised“$1,700 - $1,800” | — | — | — |
| Casa Berardi cash cost, per gold ounce (after by-product credits) | — | — | New“$1,500-$1,650/oz” | — | — | — | — | — |
| Casa Berardi Cash costs, after by-product credits, per gold ounce | — | New“$1,500 - $1,650” | — | — | — | — | — | — |
| Casa Berardi cost of sales | — | — | New“$180 million” | — | — | — | — | — |
| Casa Berardi gold production | — | — | — | — | New“92.0-95.0 thousand ounces” | — | — | — |
| Casa Berardi gold production | — | — | New“76.0-82.0koz” | Reiterated“76.0-82.0koz” | — | — | — | — |
| Casa Berardi Gold Production (Koz) | — | — | — | — | New“92.0 - 95.0” | — | — | — |
| Casa Berardi gold-equivalent production (Koz) | — | New“76.0 - 82.0” | — | — | — | — | — | — |
| Casa Berardi Silver Equivalent (Moz) | — | — | New“6.5 - 7.5” | Reiterated“6.5 - 7.5” | Raised“8.5 - 9.0” | — | — | — |
| Casa Berardi Silver Production (Moz) | — | New“N/A” | Reiterated“N/A” | Reiterated“N/A” | Reiterated“N/A” | — | — | — |
| Casa Berardi silver-equivalent production (Moz) | — | New“6.5 - 7.5” | — | — | — | — | — | — |
| Casa Berardi total cost of sales | — | — | — | New“$180 million” | Raised“$205 million” | — | — | — |
| Casa Berardi Total Costs of Sales (million) | — | New“165.5” | Raised“180.0” | Reiterated“180.0” | Raised“205.0” | — | — | — |
| Common stock quarterly dividend declared | — | — | — | — | New“$0.00375 per share” | — | — | — |
| Consolidated capital investment | — | New“$222-$242 million” | Reiterated“$222-$242 million” | Reiterated“$222-$242 million” | — | — | — | — |
| Consolidated gold production | — | — | New“120-130 koz” | Raised“126-137 koz” | Raised“145.0-150.0 koz” | — | — | — |
| Consolidated gold production | — | New“120-130 thousand ounces” | — | — | — | — | — | — |
| Consolidated silver production | — | New“15.5-17.0 million ounces” | Reiterated“15.5-17.0 million ounces” | Reiterated“15.5-17.0 million ounces” | Narrowed“16.2-17.0 million ounces” | — | — | — |
| Estimated production impact at Keno Hill from planned YEC power curtailment | — | — | — | New“approximately 90,000 ounces of silver” | — | — | — | — |
| Exploration & Pre-Development | — | — | New“$28” | Reiterated“$28” | Reiterated“$28” | — | — | — |
| Exploration & Pre-Development expenditures - Total | — | New“$28” | — | — | — | — | — | — |
| Exploration and pre-development expenditure | — | — | — | — | New“$28 million” | — | — | — |
| Exploration and pre-development expenditures | — | — | New“$28 million” | Reiterated“$28 million” | — | — | — | — |
| Greens Creek AISC, after by-product credits, per produced silver ounce | — | — | — | New“($1.00) - $0.50” | Reiterated“($1.00) - $0.50” | — | — | — |
| Greens Creek AISC, after by-product credits, per silver ounce | — | New“$8.75 - $9.50” | — | Changed“$0.00-$1.50” | — | — | — | — |
| Greens Creek AISC, per silver ounce (after by-product credits) | — | — | New“$6.50-$7.25” | — | — | — | — | — |
| Greens Creek Capital expenditures - Growth (millions) | — | New“$10 - $12” | Reiterated“$10 - $12” | Reiterated“$10 - $12” | Lowered“$2 - $5” | — | — | — |
| Greens Creek Capital expenditures - Sustaining (millions) | — | New“$48 - $51” | Reiterated“$48 - $51” | Reiterated“$48 - $51” | Lowered“$45 - $47” | — | — | — |
| Greens Creek Capital expenditures - Total (millions) | — | New“$58 - $63” | Reiterated“$58 - $63” | Reiterated“$58 - $63” | Lowered“$47 - $52” | — | — | — |
| Greens Creek capital investment | — | — | — | New“$48-$51 million in sustaining capital and $10-$12 million in growth capital” | — | — | — | — |
| Greens Creek Cash cost, after by-product credits, per silver ounce | — | — | — | New“($7.00) - ($5.75)” | Reiterated“($7.00) - ($5.75)” | — | — | — |
| Greens Creek cash cost, per silver ounce (after by-product credits) | — | — | New“$0.25-$0.75” | — | — | — | — | — |
| Greens Creek Cash costs, after by-product credits, per silver ounce | — | New“$2.00 - $2.50” | — | — | — | — | — | — |
| Greens Creek cost of sales | — | — | New“$289 million” | — | — | — | — | — |
| Greens Creek Gold Equivalent (Koz) | — | — | New“200.0 - 210.0” | Lowered“189.0 - 200.0” | Narrowed“195.0 - 200.0” | — | — | — |
| Greens Creek gold production | — | — | New“44.0-48.0 thousand ounces of gold” | Raised“50.0-55.0 thousand ounces” | Narrowed“53.0-55.0 thousand ounces” | — | — | — |
| Greens Creek Gold Production (Koz) | — | New“44.0 - 48.0” | Reiterated“44.0 - 48.0” | Raised“50.0 - 55.0” | Narrowed“53.0 - 55.0” | — | — | — |
| Greens Creek gold-equivalent production (Koz) | — | New“200.0 - 210.0” | — | — | — | — | — | — |
| Greens Creek Silver Equivalent (Moz) | — | — | New“18.0 - 19.5” | Reiterated“18.0 - 19.5” | Narrowed“18.5 - 19.0” | — | — | — |
| Greens Creek silver equivalent ounce | — | — | — | New“18.0-19.5 million silver equivalent ounces” | — | — | — | — |
| Greens Creek silver equivalent ounces | — | — | New“18.0-19.5 million silver equivalent ounces” | — | — | — | — | — |
| Greens Creek silver production | — | New“8.1-8.8 million ounces” | Reiterated“8.1-8.8 million ounces of silver” | Reiterated“8.1-8.8 million ounces of silver” | Narrowed“8.4-8.8 million ounces” | — | — | — |
| Greens Creek Silver Production (Moz) | — | New“8.1 - 8.8” | Reiterated“8.1 - 8.8” | Reiterated“8.1 - 8.8” | Narrowed“8.4 - 8.8” | — | — | — |
| Greens Creek silver-equivalent production (Moz) | — | New“18.0 - 19.5” | — | — | — | — | — | — |
| Greens Creek total cost of sales | — | — | — | New“$289 million” | — | — | — | — |
| Greens Creek total cost of sales outlook | — | — | — | — | New“$289 million” | — | — | — |
| Greens Creek Total Costs of Sales (million) | — | New“289.0” | Reiterated“289.0” | Reiterated“289.0” | Reiterated“289.0” | — | — | — |
| Keno Hill Capital expenditures - Growth (millions) | — | New“$43 - $48” | Reiterated“$43 - $48” | Reiterated“$43 - $48” | Raised“$48 - $54” | — | — | — |
| Keno Hill Capital expenditures - Sustaining (millions) | — | — | New“$0” | Reiterated“$0” | Reiterated“$0” | — | — | — |
| Keno Hill capital investment | — | — | — | — | New“$48-$54 million” | — | — | — |
| Keno Hill Gold Equivalent (Koz) | — | — | New“30.0 - 40.0” | Reiterated“30.0 - 40.0” | Narrowed“35.0 - 40.0” | — | — | — |
| Keno Hill Gold Production (Koz) | — | New“N/A” | Reiterated“N/A” | Reiterated“N/A” | Reiterated“N/A” | — | — | — |
| Keno Hill gold-equivalent production (Koz) | — | New“30.0 - 40.0” | — | — | — | — | — | — |
| Keno Hill production costs, excluding depreciation | — | New“$15-$17 million per quarter” | — | — | — | — | — | — |
| Keno Hill Silver Equivalent (Moz) | — | — | New“3.0 - 3.5” | Reiterated“3.0 - 3.5” | Reiterated“3.0 - 3.5” | — | — | — |
| Keno Hill silver production | — | New“2.7-3.1 million ounces” | Reiterated“2.7-3.1 million ounces” | Reiterated“2.7-3.1 million ounces” | Narrowed“2.9-3.1 million ounces” | — | — | — |
| Keno Hill Silver Production (Moz) | — | New“2.7 - 3.1” | Reiterated“2.7 - 3.1” | Reiterated“2.7 - 3.1” | Narrowed“2.9 - 3.1” | — | — | — |
| Keno Hill silver-equivalent production (Moz) | — | New“3.0 - 3.5” | — | — | — | — | — | — |
| Lucky Friday AISC, after by-product credits, per produced silver ounce | — | — | — | — | New“$21.00 - $22.50” | — | — | — |
| Lucky Friday AISC, after by-product credits, per silver ounce | — | New“$16.50 - $18.00” | — | Raised“$20.00-$21.50” | — | — | — | — |
| Lucky Friday AISC, per silver ounce (after by-product credits) | — | — | New“$20.00-$21.50” | — | — | — | — | — |
| Lucky Friday Capital expenditures - Growth (millions) | — | New“$5 - $7” | Reiterated“$5 - $7” | Reiterated“$5 - $7” | Reiterated“$5 - $7” | — | — | — |
| Lucky Friday Capital expenditures - Sustaining (millions) | — | New“$58 - $61” | Reiterated“$58 - $61” | Reiterated“$58 - $61” | Reiterated“$58 - $61” | — | — | — |
| Lucky Friday Capital expenditures - Total (millions) | — | New“$63 - $68” | Reiterated“$63 - $68” | Reiterated“$63 - $68” | Reiterated“$63 - $68” | — | — | — |
| Lucky Friday Cash cost, after by-product credits, per silver ounce | — | — | — | New“$7.00-$7.50” | Raised“$7.50 - $8.50” | — | — | — |
| Lucky Friday cash cost, per silver ounce (after by-product credits) | — | — | New“$7.00-$7.50” | — | — | — | — | — |
| Lucky Friday Cash costs, after by-product credits, per silver ounce | — | New“$4.25 - $4.75” | — | — | — | — | — | — |
| Lucky Friday cost of sales | — | — | New“$165 million” | — | — | — | — | — |
| Lucky Friday Gold Equivalent (Koz) | — | — | New“90.0 - 95.0” | Lowered“80.0 - 85.0” | Reiterated“80.0 - 85.0” | — | — | — |
| Lucky Friday Gold Production (Koz) | — | New“N/A” | Reiterated“N/A” | Reiterated“N/A” | Reiterated“N/A” | — | — | — |
| Lucky Friday gold-equivalent production (Koz) | — | New“90.0 - 95.0” | — | — | — | — | — | — |
| Lucky Friday Silver Equivalent (Moz) | — | — | New“8.0 - 8.5” | Reiterated“8.0 - 8.5” | Reiterated“8.0 - 8.5” | — | — | — |
| Lucky Friday silver equivalent ounce | — | — | — | New“8.0-8.5 million silver equivalent ounces” | — | — | — | — |
| Lucky Friday silver equivalent ounces | — | — | New“8.0-8.5 million silver equivalent ounces” | — | — | — | — | — |
| Lucky Friday silver production | — | New“4.7-5.1 million ounces” | Reiterated“4.7-5.1 million ounces of silver” | Reiterated“4.7-5.1 million ounces of silver” | Narrowed“4.9-5.1 million ounces” | — | — | — |
| Lucky Friday Silver Production (Moz) | — | New“4.7 - 5.1” | Reiterated“4.7 - 5.1” | Reiterated“4.7 - 5.1” | Narrowed“4.9 - 5.1” | — | — | — |
| Lucky Friday silver-equivalent production (Moz) | — | New“8.0 - 8.5” | — | — | — | — | — | — |
| Lucky Friday total cost of sales | — | — | — | New“$165 million” | Raised“$175 million” | — | — | — |
| Lucky Friday Total Costs of Sales (million) | — | New“135.0” | Raised“165.0” | Reiterated“165.0” | Raised“175.0” | — | — | — |
| Quarterly cash dividend on common stock | — | — | — | New“$0.00375 per share” | — | — | — | — |
| Quarterly cash dividend on Series B preferred stock | — | — | — | New“$0.875 per share” | — | — | — | — |
| Quarterly common stock dividend declared | — | New“$0.00375 per share” | — | — | — | — | — | — |
| Quarterly Series B preferred stock dividend declared | — | New“$0.875 per share” | — | — | — | — | — | — |
| Total capital (growth and sustaining) expenditure | — | — | — | — | New“$222-$242 million” | — | — | — |
| Total Capital expenditures - Growth (millions) | — | New“$97 - $109” | Reiterated“$97 - $109” | Reiterated“$97 - $109” | Raised“$100 - $113” | — | — | — |
| Total Capital expenditures - Sustaining (millions) | — | New“$125 - $133” | Reiterated“$125 - $133” | Reiterated“$125 - $133” | Lowered“$122 - $129” | — | — | — |
| Total Capital expenditures - Total (millions) | — | New“$222 - $242” | Reiterated“$222 - $242” | Reiterated“$222 - $242” | Reiterated“$222 - $242” | — | — | — |
| Total consolidated gold production (Koz) | — | New“120.0 - 130.0” | — | — | — | — | — | — |
| Total consolidated gold-equivalent production (Koz) | — | New“396.0 - 427.0” | — | — | — | — | — | — |
| Total consolidated silver production (Moz) | — | New“15.5 - 17.0” | — | — | — | — | — | — |
| Total consolidated silver-equivalent production (Moz) | — | New“35.5 - 39.0” | — | — | — | — | — | — |
| Total Gold Equivalent (Koz) | — | — | New“396.0 - 427.0” | Lowered“375.0 - 407.0” | Raised“402.0 - 420.0” | — | — | — |
| Total Gold Production (Koz) | — | — | New“120.0 - 130.0” | Raised“126.0 - 137.0” | Raised“145.0 - 150.0” | — | — | — |
| Total silver AISC (after by-product credits, per silver ounce) | — | — | — | New“$11.50-$13.50/oz” | — | — | — | — |
| Total Silver AISC per silver ounce, after by-product credits | — | New“$15.75 - $17.00” | Reiterated“$15.75-$17.00/oz” | — | — | — | — | — |
| Total Silver AISC, after by-product credits, per produced silver ounce | — | — | — | New“$11.00 - $13.00” | Reiterated“$11.00 - $13.00” | — | — | — |
| Total Silver Cash cost, after by-product credits, per silver ounce | — | — | — | New“($1.25)-($0.75)/oz” | Widened“($1.75) - ($0.75)” | — | — | — |
| Total silver cash cost, per silver ounce (after by-product credits) | — | — | New“$3.00-$3.25/oz” | — | — | — | — | — |
| Total Silver cash costs per silver ounce, after by-product credits | — | New“$3.00 - $3.25” | — | — | — | — | — | — |
| Total Silver Equivalent (Moz) | — | — | New“35.5 - 39.0” | Reiterated“35.5 - 39.0” | Raised“38.0 - 40.0” | — | — | — |
| Total Silver Production (Moz) | — | — | New“15.5 - 17.0” | Reiterated“15.5 - 17.0” | Narrowed“16.2 - 17.0” | — | — | — |
| Total Silver Total Costs of Sales (million) | — | New“424.0” | Raised“454.0” | Reiterated“454.0” | Raised“464.0” | — | — | — |
| For FY2024 | ||||||||
| Casa Berardi - Growth Capital expenditures | New“$42 - $46” | — | — | — | — | — | — | — |
| Casa Berardi - Sustaining Capital expenditures | New“$14 - $17” | — | — | — | — | — | — | — |
| Casa Berardi - Total Capital expenditures | New“$56 - $63” | — | — | — | — | — | — | — |
| Casa Berardi AISC, after by-product credits, per produced gold ounce, Current | New“$1,750 - $1,975” | — | — | — | — | — | — | — |
| Casa Berardi cash cost, after by-product credits, per gold ounce, Current | New“$1,500 - $1,700” | — | — | — | — | — | — | — |
| Casa Berardi Costs of Sales (million), Current | New“215” | — | — | — | — | — | — | — |
| Casa Berardi Gold Production (Koz), Current | New“80 - 87” | — | — | — | — | — | — | — |
| Casa Berardi Silver Equivalent (Moz), Current | New“6.9 - 7.5” | — | — | — | — | — | — | — |
| Expenditures on production costs, excluding depreciation, at Keno Hill | New“$25-$27 million per quarter” | — | — | — | — | — | — | — |
| Exploration | New“$25” | — | — | — | — | — | — | — |
| Greens Creek - Growth Capital expenditures | New“$3 - $5” | — | — | — | — | — | — | — |
| Greens Creek - Sustaining Capital expenditures | New“$47 - $50” | — | — | — | — | — | — | — |
| Greens Creek - Total Capital expenditures | New“$50 - $55” | — | — | — | — | — | — | — |
| Greens Creek AISC, after by-product credits, per produced silver ounce, Current | New“$7.50 - $8.00” | — | — | — | — | — | — | — |
| Greens Creek cash cost, after by-product credits, per silver ounce, Current | New“$1.50 - $2.00” | — | — | — | — | — | — | — |
| Greens Creek Costs of Sales (million), Current | New“265” | — | — | — | — | — | — | — |
| Greens Creek Gold Equivalent (Koz), Current | New“226 - 236” | — | — | — | — | — | — | — |
| Greens Creek Gold Production (Koz), Current | New“46 - 51” | — | — | — | — | — | — | — |
| Greens Creek Silver Equivalent (Moz), Current | New“19.5 - 20.5” | — | — | — | — | — | — | — |
| Greens Creek Silver Production (Moz), Current | New“8.6 - 9.0” | — | — | — | — | — | — | — |
| Keno Hill - Growth Capital expenditures | New“$35 - $38” | — | — | — | — | — | — | — |
| Keno Hill - Sustaining Capital expenditures | New“$10 - $12” | — | — | — | — | — | — | — |
| Keno Hill - Total Capital expenditures | New“$45 - $50” | — | — | — | — | — | — | — |
| Keno Hill Gold Equivalent (Koz), Current | New“36 - 40” | — | — | — | — | — | — | — |
| Keno Hill Silver Equivalent (Moz), Current | New“3.0 - 3.5” | — | — | — | — | — | — | — |
| Keno Hill Silver Production (Moz), Current | New“2.7 - 3.0” | — | — | — | — | — | — | — |
| Lucky Friday - Growth Capital expenditures | New“$3 - $5” | — | — | — | — | — | — | — |
| Lucky Friday - Sustaining Capital expenditures | New“$42 - $45” | — | — | — | — | — | — | — |
| Lucky Friday - Total Capital expenditures | New“$45 - $50” | — | — | — | — | — | — | — |
| Lucky Friday AISC, after by-product credits, per produced silver ounce, Current | New“$14.50 - $15.00” | — | — | — | — | — | — | — |
| Lucky Friday cash cost, after by-product credits, per silver ounce, Current | New“$6.00 - $6.50” | — | — | — | — | — | — | — |
| Lucky Friday Costs of Sales (million), Current | New“140” | — | — | — | — | — | — | — |
| Lucky Friday Gold Equivalent (Koz), Current | New“100 - 105” | — | — | — | — | — | — | — |
| Lucky Friday Silver Equivalent (Moz), Current | New“8.8 - 9.1” | — | — | — | — | — | — | — |
| Lucky Friday Silver Production (Moz), Current | New“4.7 - 5.0” | — | — | — | — | — | — | — |
| Pre-Development | New“$6.5” | — | — | — | — | — | — | — |
| Total Capital expenditures - Growth | New“$83 - $94” | — | — | — | — | — | — | — |
| Total Capital expenditures - Sustaining | New“$113 - $124” | — | — | — | — | — | — | — |
| Total Capital expenditures - Total | New“$196 - $218” | — | — | — | — | — | — | — |
| Total Gold Equivalent (Koz), Current | New“442 - 468” | — | — | — | — | — | — | — |
| Total Gold Production (Koz), Current | New“126 - 138” | — | — | — | — | — | — | — |
| Total Silver AISC, after by-product credits, per produced silver ounce, Current | New“$13.50 - $14.50” | — | — | — | — | — | — | — |
| Total Silver cash cost, after by-product credits, per silver ounce, Current | New“$3.00 - $3.75” | — | — | — | — | — | — | — |
| Total Silver Costs of Sales (million), Current | New“405” | — | — | — | — | — | — | — |
| Total Silver Equivalent (Moz), Current | New“38.2 - 40.6” | — | — | — | — | — | — | — |
| Total Silver Production (Moz), Current | New“16.0 - 17.0” | — | — | — | — | — | — | — |
| No period stated | ||||||||
| Casa Berardi 160 pit gold production | — | New“until 2027” | — | — | — | — | — | — |
| Casa Berardi production gap | — | New“commencing in 2027 and continuing until 2032 or later” | — | — | — | — | — | — |
| Copper price assumption | — | — | — | — | — | — | — | New“$4.00/lb” |
| Exchange rate (CAD/USD) | — | — | — | — | — | — | — | New“1.35” |
| Gold price assumption | — | — | — | — | — | — | — | New“$4,000/oz” |
| Keno Hill expected increase in throughput | — | New“600 tons per day” | — | — | — | — | — | — |
| Keno Hill production costs, excluding depreciation | — | New“$15-$17 million” | — | — | — | — | — | — |
| Keno Hill throughput objective (permitted capacity) | — | — | — | — | — | — | New“440 tons per day” | — |
| Lead price assumption | — | — | — | — | — | — | — | New“$0.85/lb” |
| Lucky Friday reserve mine-life | — | New“seventeen years” | — | — | — | — | — | — |
| Quarterly cash dividend of common stock | New“$0.01375 per share” | — | — | — | — | — | — | — |
| Quarterly cash dividend of preferred stock | New“$0.875 per share” | — | — | — | — | — | — | — |
| Quarterly cash dividend, common stock | — | — | New“$0.00375 per share of common stock” | — | — | — | — | — |
| Quarterly cash dividend, Series B preferred stock | — | — | New“$0.875 per share of Series B preferred stock” | — | — | — | — | — |
| Silver price assumption | — | — | — | — | — | — | — | New“$55.00/oz” |
| Zinc price assumption | — | — | — | — | — | — | — | New“$1.40/lb” |