HighGravityData

Matador Resources — Feb 18, 2025 release

Fiscal 2024 fourth-quarter results · 8-K Item 2.02 · Exhibit 99.1 · 0001520006-25-000032
Open on SEC.gov ↗
Showing in the filing
Matador's 51% share of San Mateo capital expenditures
“$90 to $130 million”
Period
FY2025
Measure
Company-defined measure
Source
Prose
All guidance in this release · 40
Annual dividend rate for FY2024
“$1.25 annually, or $0.3125 per quarter”
Dividend policy
“$1.25 annually, or $0.3125 per quarter”
Quarterly cash dividend for FY2025
“$0.3125 per share of common stock”
Quarterly cash dividend
“$0.3125 per share”
Adjusted free cash flow for FY2025
“approach $1 billion”
Additional drilling and completion cost syne…
“over $150 million”
Marlan Plant expansion for Q2 FY2025
“expected to be online”
Average daily BOE production for FY2025
“205,000 BOE per day”
Average daily oil production for FY2025
“122,000 barrels of oil per day”
San Mateo Adjusted EBITDA for FY2025
“$285 million”
San Mateo natural gas processing capacity for Q2 FY2025
“720 million cubic feet per day”
Oil production for FY2025
“120,000 to 124,000 barrels per day”
Natural gas production for FY2025
“492.0 to 504.0 million cubic feet per day”
Total production for FY2025
“202,000 to 208,000 BOE per day”
Drilling, completing and equipping capital e… for FY2025
“$1.28 to $1.47 billion”
Midstream capital expenditures for FY2025
“$120 to $180 million”
% Oil for Q1 FY2025
“59%”
Natural Gas Production for FY2025
“492.0 to 504.0 MMcf/d”
Oil Equivalent Production for FY2025
“202,000 to 208,000 BOE/d”
Midstream CapEx (6) for FY2025
“$120 to $180 million”
Total D/C/E and Midstream CapEx for FY2025
“$1.40 to $1.65 billion”
Total capital expenditures for FY2025
“$1.53 billion”
Operated (D/C/E CapEx) for FY2025
“$1.16 to $1.32 billion”
Non-Operated (D/C/E CapEx) for FY2025
“$70 to $90 million”
Capitalized G&A and Interest (D/C/E CapEx) for FY2025
“$50 to $60 million”
Total D/C/E CapEx for FY2025
“$1.28 to $1.47 billion”
Artificial lift and other production-related… for FY2025
“$60 to $70 million”
Drilling and completion costs per completed … for FY2025
“between $865 to $895 per completed lateral foot”
Simul-Frac and Trimul-Frac operations share … for FY2025
“over 80%”
Trimul-Frac share of anticipated completions for FY2025
“approximately 35%”
Matador's 51% share of San Mateo capital exp… for FY2025
“$90 to $130 million”
San Mateo estimated capital expenditures (10… for FY2025
“approximately $176 to $255 million”
Other wholly-owned midstream projects capita… for FY2025
“$30 to $50 million”
Average Daily Total Production, BOE per day … for Q1 FY2025
“195,000 to 197,000”
Average Daily Oil Production, Bbl per day (Q… for Q1 FY2025
“114,000 to 115,000”
Average Daily Natural Gas Production, MMcf p… for Q1 FY2025
“486.0 to 492.0”
Operated wells turned to sales for Q1 FY2025
“between 35 and 40”
D/C/E capital expenditures for Q1 FY2025
“approximately $340 to $400 million”
Proportionate share of midstream capital exp… for Q1 FY2025
“approximately $65 to $95 million”
Cash tax payments (% of pre-tax book net inc… for FY2025
“approximately 5 to 10%”
Exhibit 99.1 · the passage around this item
… earlier in the release
Notably, Matador expects that improved water and sand logistics, casing design optimization, MaxCom well targeting, use of existing infrastructure and increased operating efficiency should reduce drilling and completion days on wells. • Matador estimates 2025 midstream capital expenditures of $120 to $180 million. This estimate includes (i) $90 to $130 million for Matador’s 51% share of San Mateo’s 2025 estimated capital expenditures of approximately $176 to $255 million and (ii) $30 to $50 million for other wholly-owned midstream projects, including expansion of the 180 mile gas gathering, water gathering and oil transportation and gathering pipeline system that Matador acquired in connection with the Ameredev acquisition. San Mateo’s 2025 capital expenditures include finishing the Marlan Plant expansion as well as the pipelines and related infrastructure required to connect San Mateo’s three-stream pipeline system to Matador and third-party customers. 2025 Production Estimates and Cadence Oil, Natural Gas and Oil Equivalent Production Growth and Anticipated Cadence Matador expects full-year 2025 production of 120,000 to 124,000 barrels of oil per day and 492 to 504 million cubic feet of natural gas per day, resulting in 202,000 to 208,000 BOE per day, which would be an increase of 20% as compared to our record 2024 production of 170,751 BOE per day (99,808 barrels of oil per day). The cadence of production is expected to be lumpy throughout 2025, primarily due to completion timing and larger, more capital efficient batches. As detaile
later in the release …
the item shown at left
other guidance in this release
Text is the filed exhibit, verbatim.